You are at:

Equipment trials

Testing of containment and collection equipment for high-current areas was carried out on the Loire estuary in early October with the support of:

-          DAM and Cerema

-          TOTAL and FOST

-          GPMNSN

-          Subdivision phares et balises de Saint-Nazaire

Launching of the equipment took place at the Donges agri-food terminal in the presence of DESMI, LAMOR and EGERSUND.

During the first week, the Speed Sweep of the Danish manufacturer DESMI was tested:

Equipment DESMI (1)
Equipment DESMI (1)
Equipment DESMI (2)
Equipment DESMI (2)

 

 

 

 

 

 

 

 

 

 

During the 2nd week, the LMOS15 was tested, it is manufactured jointly by the Finnish LAMOR and the Norwegian EGERSUN:

Equipment LAMOR and EGERSUND (1)
Equipment LAMOR and EGERSUND (1)

Equipment LAMOR and EGERSUND (2)
Equipment LAMOR and EGERSUND (2)

 

 

 

 

 

 

 

 

 

 The trials were conducted under appropriate weather conditions and the extensive data collected are currently being analyzed at Cedre.

Last update: 19/10/2017